鶹AV

鶹AV has mandated Corenov Constructeurs Incto carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:Mona Modarressi - mona.modarressi [at] mcgill.ca

Assistant project managers:Mark Grzywacz - mark.grzywacz [at] mcgill.ca; Thomas Perreault - thomas.perreault [at] mcgill.ca

Construction start:December 2023

Classified as: Pavillon Wong
Publié le: 4 déc 2023

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

Temporary classroom modules on a field

Classified as: Centennial Centre
Publié le: 30 nov 2023

鶹AV has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: Parasitology
Publié le: 30 nov 2023

鶹AV has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:Biagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Assistant project manager:Claudia Carpanzano - claudia.carpanzano [at] mcgill.ca

Classified as: Centennial Centre
Publié le: 20 nov 2023

鶹AV has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager: Johanne Guertin - Johanne.guertin [at] gph-inc.com

Assistant project manager: Gabriel Fortin - Gabriel.fortin [at] gph-inc.com

Construction start date:November 14, 2023

Classified as: MNI, montreal neurological institute
Publié le: 8 nov 2023

鶹AV has mandated Planit Construction to carry out the following project:MNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the 鶹AV Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

Publié le: 8 nov 2023

鶹AV has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:Mark Ouimet –mark.ouimet [at] mcgill.ca

Assistant project manager: Claudia Carpanzano-Claudia.carpanzano [at] mcgill.ca

Classified as: Macdonald Campus, Macdonald Stewart Building
Publié le: 19 sep 2023

鶹AV has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:Eric Boutet, CIMA+ - eric.boutet [at] cima.ca">eric.boutet [at] cima.ca

Classified as: MNI, montreal neurological institute
Publié le: 19 sep 2023

鶹AV has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:Mark Ouimet –mark.ouimet [at] mcgill.ca

Assistant project manager: Claudia Carpanzano-Claudia.carpanzano [at] mcgill.ca

Classified as: Macdonald Campus, Macdonald Stewart Building
Publié le: 19 sep 2023

鶹AV has mandated NR Brosseau to carry out the following project:McIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -Andrea.gore [at] mcgill.ca

Assistant project manager: Ellie Tayebi -Ellie.tayebi [at] mcgill.ca

Construction start date:July 7, 2023

Classified as: McIntyre, McIntyre building
Publié le: 6 juil 2023

鶹AV has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

Project manager:Emika Marinacci -Emika.marinacci [at] mcgill.ca

Classified as: McIntyre building, McIntyre
Publié le: 6 juil 2023

鶹AV has mandated Corenov Constructeurs to carry out the following project:Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager andAssistant Project Manager:

Classified as: Morrice Hall
Publié le: 27 juin 2023

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

Classified as: Strathcona Music, éԴDZپDz
Publié le: 20 juin 2023

Please be advised that 鶹AV has mandated Concept P.V.R. Inc.to carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) – Electrical upgrade

Description :

Classified as: arena, construction, éԴDZپDz
Publié le: 20 juin 2023

鶹AV has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.

Project manager:Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:Jeremy Elbaz -Jeremy.elbaz [at] mcgill.ca

Classified as: Peterson Hall
Publié le: 9 juin 2023

Pages

Back to top