Â鶹AV

subscribe

Construction Start: Centennial Centre - Temporary classrooms

Project: Centennial Centre / 23-035 - Installation of temporary classrooms.

The project consists of the installation of a temporary classroom complex near the Centennial Centre at the Macdonald Campus.

Published: 30 Nov 2023

Construction Start: Wong Building - Space simulator

Â鶹AV has mandated Corenov Constructeurs IncÌýto carry out the following project: Wong Building / 20-094 - Space simulator.

Project manager:ÌýMona Modarressi - mona.modarressi [at] mcgill.ca

Published: 30 Nov 2023

Construction Start: Parasitology Building - JELF Cestari

Â鶹AV has mandated CORENOV CONSTRUCTEURS to carry out the following project: Parasitology Building / 19-136 - JELF Cestari.

The project consists of the renovation of labs P103 and P209 on the first and second floor of the Parasitology Building at the Macdonald Campus.

Project manager:ÌýBiagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Published: 30 Nov 2023

Construction Start: Centennial Centre - JELF Gillung

Â鶹AV has mandated CORENOV CONSTRUCTEURS to carry out the following project: Centennial Centre / 20-098 - JELF Gillung.

The project consists of the renovation of labs 033 and 037 in the basement of the Centennial Centre at the Macdonald Campus.

Project manager:ÌýBiagio D'Onofrio - biagio.donofrio [at] mcgill.ca

Published: 20 Nov 2023

Construction start: Montreal Neurological Institute - Balustrade

Â鶹AV has mandated St-Denis Thompson to carry out the following project: Montreal Neurological Institute / 22-035 - Priority building envelop repairs, balustrade.

The project consists of removing the stone balustrade.

Project manager:ÌýJohanne Guertin - Johanne.guertin [at] gph-inc.com

Published: 8 Nov 2023

Construction Start: MNI, Residences, Currie Gym, Milton Gate and Burnside Parking - Infrastructure for new parking equipment

Â鶹AV has mandated Planit Construction to carry out the following project:ÌýMNI, Residences, Currie Gym, Milton Gate and Burnside Parking / 18-089 Lot 1 - Infrastructure for new parking equipment.

The project consists of infrastructure work that is required for the installation of new parking equipment for various parking lots on the Â鶹AV Downtown Campus: Montreal Neurological Institute, Residences, Milton Gate, Currie Gym and Burnside Garage.

Published: 8 Nov 2023

Construction start: Montreal Neurological Institute - Cyclotron aerial exhaust

Â鶹AV has mandated Ardec Construction Inc. to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron aerial exhaust.

The project consists of installing the aerial conduit to replace the existing one at the Montreal Neurological Institute hospital.

Project manager:ÌýEric Boutet, CIMA+ - eric.boutet [at] cima.caÌý

Published: 19 Sep 2023

Construction start: Macdonald Stewart Building (Mac campus) - Basu Lab and Kitchenette

Â鶹AV has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 17-088 Basu Lab and Kitchenette.

The project consists of the renovation of rooms MS3-047 and MS3-048 on the third floor of Macdonald Stewart Building.

Project manager:ÌýMark Ouimet –Ìýmark.ouimet [at] mcgill.ca

Published: 19 Sep 2023

Construction start: Macdonald Stewart Building (Mac campus) - JELF Roy

Â鶹AV has mandated Corenov Constructeurs to carry out the following project: Macdonald Stewart Building (Macdonald Campus) / 20-021 JELF Roy.

The project consists of the renovation of lab MS2-094A on the second floor of the Macdonald Stewart Building.

Project manager:ÌýMark Ouimet –Ìýmark.ouimet [at] mcgill.ca

Published: 19 Sep 2023

Construction start: Currie Gym - Renovation of classrooms W305 and W409

Â鶹AV has mandated Immobilier Belmon to carry out the following project: Currie Gym / 16-140 - Renovation of classrooms W305 and W409.

The project consists of the upgrade of classrooms W-409 and W-305 at Currie Gym to improve the learning experience, including new seating arrangement, Audio-Visual equipment, and lighting.

Project manager:ÌýJoé Normandeau – joe.normandeau [at] gph-inc.com

Published: 17 Aug 2023

Construction start: McIntyre Medical Building - Seventh floor laboratories

Â鶹AV has mandated NR Brosseau to carry out the following project:ÌýMcIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -ÌýAndrea.gore [at] mcgill.ca

Published: 6 Jul 2023

Construction start: McIntyre Medical Building - Electrical room

Â鶹AV has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

Published: 6 Jul 2023

Construction Start: Morrice Hall - Building envelope repairs

Â鶹AV has mandated Corenov Constructeurs to carry out the following project:ÌýMorrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager andÌýAssistant Project Manager:

Published: 27 Jun 2023

Construction Start: Strathcona Music - Renovation of percussion studios

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

Published: 20 Jun 2023

Construction Start: McConnell Arena - Electrical upgrade

Please be advised that Â鶹AV has mandated Concept P.V.R. Inc.Ìýto carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) – Electrical upgrade

Description :

Published: 20 Jun 2023

Pages

Back to top